Industrial & logistics · Upcoming project

LinkUs Transportation Cross-Dock

A $7.3 million design-build project in City of Industry, California, bringing together a cross-dock facility and supporting office and repair spaces.

Explore the renderings
Project rendering of cross-dock and office exterior at LinkUs Transportation in City of Industry
Upcoming project · Project rendering
Project value
$7.3 million
Location
City of Industry, CA
Delivery
Design-build
Status
Upcoming project

Project overview

A connected campus for transportation operations.

Brady Construction Group is working on the upcoming LinkUs Transportation project in City of Industry. The project combines a cross-dock facility with supporting office, storage and repair spaces within one industrial campus.

The renderings show the relationship between the dock, loading yard, office entries and separate repair and office building. Campus aerials explain the overall arrangement; closer perspectives show the dock frontage and building approaches.

Project approach

Design and construction, considered together.

Dock access, vehicle movement, staff access and supporting workspaces are connected planning decisions. Brady’s design-build services coordinate design development and construction planning around the agreed scope, bringing the intended use, site information, budget priorities and design decisions into the same discussion.

Project details.

Where is the LinkUs project located?

The project is at 722 Parriott Place in City of Industry, California.

What is Brady’s role on the project?

Brady Construction Group is working on this $7.3 million project through a design-build delivery approach.

What is the project’s current status?

LinkUs is an upcoming project. The gallery presents project renderings, and a construction completion date has not been announced on this page.

Planning an industrial facility?

Tell us about your location, operational needs and available plans to discuss the right next step with Brady.

Project renderings