Commercial preventive maintenance

Commercial Preventive Maintenance in Southern California

Recurring maintenance built around your Southern California commercial building, its systems and the way your business operates. Define the work, coordinate the visits and put maintenance priorities into a practical plan.

Commercial properties

Planned service visits

Multiple trades

A program built around your building

Give recurring maintenance a clear place in the schedule.

Equipment, operating hours and tenant needs vary from property to property. A useful maintenance program starts with the systems you want covered and the problems your team needs to address.

Brady Construction Group provides preventive maintenance and facility-service coordination for commercial owners, property managers and facility teams. We review your property, available service records and priorities to define a recurring scope.

The starting plan identifies covered assets, recurring tasks, proposed intervals and the contact who approves additional work. That gives your team a clear way to review each service visit and distinguish scheduled maintenance from corrective repairs.

Technician using a clipboard to inspect a row of rooftop HVAC units.

What the program can cover

Organize the work by system and trade.

The proposal identifies the covered assets, tasks, visit frequency and exclusions. The following are examples to discuss during the property review.

Building systems

Coordinate maintenance needs for the equipment and systems included in your agreement.

  • HVAC service coordination
  • Electrical and lighting maintenance
  • Plumbing and fixture service needs

Building fabric

Address recurring upkeep for the spaces your occupants and visitors use.

  • Doors and hardware
  • Ceilings, drywall and finishes
  • Interior and exterior maintenance priorities

Inspection & follow-up

Connect observations from service visits with a clear next action.

  • Review agreed areas and systems
  • Document maintenance concerns
  • Separate corrective repairs from recurring tasks
Building exterior with Volkswagen and Audi signs, high windows and landscaped parking.

Define the scope

Know what is included before work begins.

Start with an asset list showing each location, equipment identifier when available, existing provider and recent service history. Add recurring complaints, tenant restrictions and shutdown windows. A focused list of priority assets is enough to begin the review; information gaps can be identified as the scope develops.

Brady’s custom service platform lets your team monitor locations, assets, maintenance, asset inspections and associated service activities. You receive a full work-order report for the work performed, plus an inspection form when inspections are involved. Review these records alongside your ongoing maintenance priorities.

Corrective repairs, replacement equipment and additional visits are addressed separately when they fall outside the agreed program. Clear authorization helps your team evaluate the next step before committing to additional work.

How it works

From property review to recurring service.

01

Review

Share the property details, covered systems, service history and priorities.

02

Define

Agree on assets, tasks, visit frequency, access and approval procedures.

03

Coordinate

Plan visits around site contacts, operating hours and the approved scope.

04

Review findings

Review the work-order report against the recurring scope. Use applicable inspection forms and asset history to discuss open concerns, additional repairs and changes to the next maintenance period.

Questions & answers

The details, before you start.

How often should maintenance visits occur?

Frequency depends on the covered equipment, manufacturer requirements, site conditions and operating schedule. The proposal defines the planned tasks and visit intervals for your property.

Are all repairs included?

The agreement identifies included work. Repairs, replacement parts or equipment, specialist work and additional visits may require a separate proposal and authorization.

Can we start with one building?

Yes. Begin with one property or a defined group of locations. The scope and workflow can be refined before adding buildings.

Can an inspection help establish the program?

A scoped facility inspection can identify observed concerns and help organize maintenance priorities. Its purpose, accessible areas and reporting requirements are agreed before the visit.

Where can we discuss service?

Brady supports commercial properties across California. Share each property address and the requested trades so the scope, coverage and scheduling can be confirmed.

Planning resources

Preventive Maintenance resources.

Practical guidance for planning maintenance, reviewing building conditions and coordinating property care.

Areas we serve

Preventive maintenance across California.

Based in Southern California, Brady supports commercial properties throughout the state. Share your property locations, requested trades and service needs so we can confirm scheduling and the next step.

Contractor qualifications and vendor onboarding

Browse all California counties58 counties · 483 incorporated cities and towns
Alameda County14 cities / towns
  • Alameda
  • Albany
  • Berkeley
  • Dublin
  • Emeryville
  • Fremont
  • Hayward
  • Livermore
  • Newark
  • Oakland
  • Piedmont
  • Pleasanton
  • San Leandro
  • Union City
Alpine CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Amador County5 cities / towns
  • Amador City
  • Ione
  • Jackson
  • Plymouth
  • Sutter Creek
Butte County5 cities / towns
  • Biggs
  • Chico
  • Gridley
  • Oroville
  • Paradise
Calaveras County1 city / town
  • Angels Camp
Colusa County2 cities / towns
  • Colusa
  • Williams
Contra Costa County19 cities / towns
  • Antioch
  • Brentwood
  • Clayton
  • Concord
  • Danville
  • El Cerrito
  • Hercules
  • Lafayette
  • Martinez
  • Moraga
  • Oakley
  • Orinda
  • Pinole
  • Pittsburg
  • Pleasant Hill
  • Richmond
  • San Pablo
  • San Ramon
  • Walnut Creek
Del Norte County1 city / town
  • Crescent City
El Dorado County2 cities / towns
  • Placerville
  • South Lake Tahoe
Fresno County15 cities / towns
  • Clovis
  • Coalinga
  • Firebaugh
  • Fowler
  • Fresno
  • Huron
  • Kerman
  • Kingsburg
  • Mendota
  • Orange Cove
  • Parlier
  • Reedley
  • San Joaquin
  • Sanger
  • Selma
Glenn County2 cities / towns
  • Orland
  • Willows
Humboldt County7 cities / towns
  • Arcata
  • Blue Lake
  • Eureka
  • Ferndale
  • Fortuna
  • Rio Dell
  • Trinidad
Imperial County7 cities / towns
  • Brawley
  • Calexico
  • Calipatria
  • El Centro
  • Holtville
  • Imperial
  • Westmorland
Inyo County1 city / town
  • Bishop
Kern County11 cities / towns
  • Arvin
  • Bakersfield
  • California City
  • Delano
  • Maricopa
  • McFarland
  • Ridgecrest
  • Shafter
  • Taft
  • Tehachapi
  • Wasco
Kings County4 cities / towns
  • Avenal
  • Corcoran
  • Hanford
  • Lemoore
Lake County2 cities / towns
  • Clearlake
  • Lakeport
Lassen County1 city / town
  • Susanville
Los Angeles County88 cities / towns
  • Agoura Hills
  • Alhambra
  • Arcadia
  • Artesia
  • Avalon
  • Azusa
  • Baldwin Park
  • Bell
  • Bell Gardens
  • Bellflower
  • Beverly Hills
  • Bradbury
  • Burbank
  • Calabasas
  • Carson
  • Cerritos
  • City of Industry
  • Claremont
  • Commerce
  • Compton
  • Covina
  • Cudahy
  • Culver City
  • Diamond Bar
  • Downey
  • Duarte
  • El Monte
  • El Segundo
  • Gardena
  • Glendale
  • Glendora
  • Hawaiian Gardens
  • Hawthorne
  • Hermosa Beach
  • Hidden Hills
  • Huntington Park
  • Inglewood
  • Irwindale
  • La Cañada Flintridge
  • La Habra Heights
  • La Mirada
  • La Puente
  • La Verne
  • Lakewood
  • Lancaster
  • Lawndale
  • Lomita
  • Long Beach
  • Los Angeles
  • Lynwood
  • Malibu
  • Manhattan Beach
  • Maywood
  • Monrovia
  • Montebello
  • Monterey Park
  • Norwalk
  • Palmdale
  • Palos Verdes Estates
  • Paramount
  • Pasadena
  • Pico Rivera
  • Pomona
  • Rancho Palos Verdes
  • Redondo Beach
  • Rolling Hills
  • Rolling Hills Estates
  • Rosemead
  • San Dimas
  • San Fernando
  • San Gabriel
  • San Marino
  • Santa Clarita
  • Santa Fe Springs
  • Santa Monica
  • Sierra Madre
  • Signal Hill
  • South El Monte
  • South Gate
  • South Pasadena
  • Temple City
  • Torrance
  • Vernon
  • Walnut
  • West Covina
  • West Hollywood
  • Westlake Village
  • Whittier
Madera County2 cities / towns
  • Chowchilla
  • Madera
Marin County11 cities / towns
  • Belvedere
  • Corte Madera
  • Fairfax
  • Larkspur
  • Mill Valley
  • Novato
  • Ross
  • San Anselmo
  • San Rafael
  • Sausalito
  • Tiburon
Mariposa CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Mendocino County4 cities / towns
  • Fort Bragg
  • Point Arena
  • Ukiah
  • Willits
Merced County6 cities / towns
  • Atwater
  • Dos Palos
  • Gustine
  • Livingston
  • Los Banos
  • Merced
Modoc County1 city / town
  • Alturas
Mono County1 city / town
  • Mammoth Lakes
Monterey County12 cities / towns
  • Carmel-by-the-Sea
  • Del Rey Oaks
  • Gonzales
  • Greenfield
  • King City
  • Marina
  • Monterey
  • Pacific Grove
  • Salinas
  • Sand City
  • Seaside
  • Soledad
Napa County5 cities / towns
  • American Canyon
  • Calistoga
  • Napa
  • St. Helena
  • Yountville
Nevada County3 cities / towns
  • Grass Valley
  • Nevada City
  • Truckee
Orange County34 cities / towns
  • Aliso Viejo
  • Anaheim
  • Brea
  • Buena Park
  • Costa Mesa
  • Cypress
  • Dana Point
  • Fountain Valley
  • Fullerton
  • Garden Grove
  • Huntington Beach
  • Irvine
  • La Habra
  • La Palma
  • Laguna Beach
  • Laguna Hills
  • Laguna Niguel
  • Laguna Woods
  • Lake Forest
  • Los Alamitos
  • Mission Viejo
  • Newport Beach
  • Orange
  • Placentia
  • Rancho Santa Margarita
  • San Clemente
  • San Juan Capistrano
  • Santa Ana
  • Seal Beach
  • Stanton
  • Tustin
  • Villa Park
  • Westminster
  • Yorba Linda
Placer County6 cities / towns
  • Auburn
  • Colfax
  • Lincoln
  • Loomis
  • Rocklin
  • Roseville
Plumas County1 city / town
  • Portola
Riverside County28 cities / towns
  • Banning
  • Beaumont
  • Blythe
  • Calimesa
  • Canyon Lake
  • Cathedral City
  • Coachella
  • Corona
  • Desert Hot Springs
  • Eastvale
  • Hemet
  • Indian Wells
  • Indio
  • Jurupa Valley
  • La Quinta
  • Lake Elsinore
  • Menifee
  • Moreno Valley
  • Murrieta
  • Norco
  • Palm Desert
  • Palm Springs
  • Perris
  • Rancho Mirage
  • Riverside
  • San Jacinto
  • Temecula
  • Wildomar
Sacramento County7 cities / towns
  • Citrus Heights
  • Elk Grove
  • Folsom
  • Galt
  • Isleton
  • Rancho Cordova
  • Sacramento
San Benito County2 cities / towns
  • Hollister
  • San Juan Bautista
San Bernardino County24 cities / towns
  • Adelanto
  • Apple Valley
  • Barstow
  • Big Bear Lake
  • Chino
  • Chino Hills
  • Colton
  • Fontana
  • Grand Terrace
  • Hesperia
  • Highland
  • Loma Linda
  • Montclair
  • Needles
  • Ontario
  • Rancho Cucamonga
  • Redlands
  • Rialto
  • San Bernardino
  • Twentynine Palms
  • Upland
  • Victorville
  • Yucaipa
  • Yucca Valley
San Diego County18 cities / towns
  • Carlsbad
  • Chula Vista
  • Coronado
  • Del Mar
  • El Cajon
  • Encinitas
  • Escondido
  • Imperial Beach
  • La Mesa
  • Lemon Grove
  • National City
  • Oceanside
  • Poway
  • San Diego
  • San Marcos
  • Santee
  • Solana Beach
  • Vista
San Francisco County1 city / town
  • San Francisco
San Joaquin County8 cities / towns
  • Escalon
  • Lathrop
  • Lodi
  • Manteca
  • Mountain House
  • Ripon
  • Stockton
  • Tracy
San Luis Obispo County7 cities / towns
  • Arroyo Grande
  • Atascadero
  • El Paso de Robles (Paso Robles)
  • Grover Beach
  • Morro Bay
  • Pismo Beach
  • San Luis Obispo
San Mateo County20 cities / towns
  • Atherton
  • Belmont
  • Brisbane
  • Burlingame
  • Colma
  • Daly City
  • East Palo Alto
  • Foster City
  • Half Moon Bay
  • Hillsborough
  • Menlo Park
  • Millbrae
  • Pacifica
  • Portola Valley
  • Redwood City
  • San Bruno
  • San Carlos
  • San Mateo
  • South San Francisco
  • Woodside
Santa Barbara County8 cities / towns
  • Buellton
  • Carpinteria
  • Goleta
  • Guadalupe
  • Lompoc
  • Santa Barbara
  • Santa Maria
  • Solvang
Santa Clara County15 cities / towns
  • Campbell
  • Cupertino
  • Gilroy
  • Los Altos
  • Los Altos Hills
  • Los Gatos
  • Milpitas
  • Monte Sereno
  • Morgan Hill
  • Mountain View
  • Palo Alto
  • San Jose
  • Santa Clara
  • Saratoga
  • Sunnyvale
Santa Cruz County4 cities / towns
  • Capitola
  • Santa Cruz
  • Scotts Valley
  • Watsonville
Shasta County3 cities / towns
  • Anderson
  • Redding
  • Shasta Lake
Sierra County1 city / town
  • Loyalton
Siskiyou County9 cities / towns
  • Dorris
  • Dunsmuir
  • Etna
  • Fort Jones
  • Montague
  • Mount Shasta
  • Tulelake
  • Weed
  • Yreka
Solano County7 cities / towns
  • Benicia
  • Dixon
  • Fairfield
  • Rio Vista
  • Suisun City
  • Vacaville
  • Vallejo
Sonoma County9 cities / towns
  • Cloverdale
  • Cotati
  • Healdsburg
  • Petaluma
  • Rohnert Park
  • Santa Rosa
  • Sebastopol
  • Sonoma
  • Windsor
Stanislaus County9 cities / towns
  • Ceres
  • Hughson
  • Modesto
  • Newman
  • Oakdale
  • Patterson
  • Riverbank
  • Turlock
  • Waterford
Sutter County2 cities / towns
  • Live Oak
  • Yuba City
Tehama County3 cities / towns
  • Corning
  • Red Bluff
  • Tehama
Trinity CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Tulare County8 cities / towns
  • Dinuba
  • Exeter
  • Farmersville
  • Lindsay
  • Porterville
  • Tulare
  • Visalia
  • Woodlake
Tuolumne County1 city / town
  • Sonora
Ventura County10 cities / towns
  • Camarillo
  • Fillmore
  • Moorpark
  • Ojai
  • Oxnard
  • Port Hueneme
  • Santa Paula
  • Simi Valley
  • Thousand Oaks
  • Ventura (San Buenaventura)
Yolo County4 cities / towns
  • Davis
  • West Sacramento
  • Winters
  • Woodland
Yuba County2 cities / towns
  • Marysville
  • Wheatland

Our coverage also includes unincorporated communities. If your community is not listed as a city or town, send us the property address and scope of work.

Brady Facility Services

Build a maintenance plan around your property.

Tell us the location, building type and systems you want covered. We will review your needs and confirm the next step.