A clearer start for your next space

Tenant Improvement Cost Calculator.

Describe your space and the changes you have in mind. Add photos if you have them, review the suggested scope, and explore a preliminary project budget.

Turn an idea into a better first conversation.

For office, retail and warehouse-office improvements. AI helps review your scope; planning allowances provide a budget range for the work you confirm.

Private, non-union projects · No account required

Prefer a separate window? Open the calculator in a separate window.

Before you begin

A planning tool for the early decisions.

Is this a contractor quote?

No. The result is an illustrative planning range based on the information and work selections you provide. A site review, confirmed scope, plans where needed, and current supplier and trade pricing are required before a contractor proposal.

Do I need photos or drawings?

You can start with a description and the approximate area being renovated. Photos can help AI identify visible conditions and clarify the scope. The tool does not measure a space from photos or verify concealed conditions, system capacity or code requirements.

How does location affect the budget?

The calculator provides major city and regional selections with sourced labor adjustments. Local material prices and base trade allowances remain estimates that need verification. Selecting a market does not confirm Brady service coverage. Prevailing-wage and union projects are outside this calculator.

Will my project be sent to Brady?

The calculator does not automatically submit your project or photos to Brady. When you authorize an AI review, the entered scope and selected photos are sent to OpenAI for analysis. Download your summary and contact our team when you are ready to discuss it.

Let’s talk about your space.

Have a location, a scope or a target opening date? Bring your project summary to a conversation with Brady so we can discuss service coverage and the next steps.