Construction planning · Owner’s guide
Construction Submittals: An Owner’s Guide to Keeping Decisions Moving
What a submittal is, who reviews it, and how owners can avoid turning routine product decisions into schedule delays.
Brady Construction Group, Inc. · November 13, 2026
A construction submittal is a package of information about a proposed material, product, assembly, or fabrication before it is installed. Depending on the project, it may contain product data, shop drawings, samples, or other information required by the drawings and specifications. The review helps the project team check a proposed choice against the design intent and contract requirements.
For an owner planning a commercial renovation or tenant improvement, the useful question is not simply “Has the architect approved everything?” It is “Which choices must be resolved before procurement or installation, who owes each response, and when?” The answer belongs in a submittal schedule tied to the construction schedule.
What goes into the submittal process?
Requirements vary by contract. A typical sequence starts when the contractor identifies required submittals from the contract documents. A supplier or trade contractor prepares the package; the general contractor checks it for coordination and completeness; then the design professional reviews it within the scope of the agreement. The response may allow the team to proceed, require corrections and resubmission, or identify a question that needs a formal design decision.
The American Institute of Architects’ discussion of the submittal process explains the distinction between action submittals, which call for a response, and informational submittals, which are provided for the record. Your project’s documents determine the actual categories and approval path.
Why owners should care before construction starts
Submittals can affect long-lead items, room dimensions, equipment connections, finish appearance, and the order in which trades work. If a product is selected late, a replacement may affect multiple drawings and procurement dates. If a package is incomplete, the reviewer may return it without a decision. Those delays can be difficult to recover once the work area is open or a tenant move is scheduled.
Ask the project team to identify early packages that drive the schedule: equipment, storefront or glazing, custom millwork, door hardware, lighting, flooring, and other scope-specific items. The list should come from the actual plans and specifications, not from a generic template.
Five questions to ask at the kickoff meeting
- What requires a submittal? Identify each required package and whether it needs an action or is informational.
- Who prepares and checks it? Record the supplier, trade contractor, and general contractor roles before it reaches the design team.
- Who makes the final choice? Finish selections or owner-furnished equipment may need a distinct owner decision in addition to design review.
- When is the answer needed? Work backward from fabrication, delivery, installation, and tenant occupancy dates.
- How are deviations handled? Flag proposed substitutions or departures from the documents explicitly. Do not assume a reviewed submittal silently changes the contract.
Keep the decision record usable
A practical log includes the item name, specification or drawing reference, responsible trade, submission date, review due date, response, revision number, and procurement impact. When a response calls for resubmission, the next due date should be visible. When the owner must choose a finish, show that choice separately from the architect’s technical review.
One recurring problem is a package that mixes several decisions. For example, a millwork submission may include dimensions, finishes, hardware, and equipment openings. A clear response should identify which parts are accepted and which remain open so the team does not proceed on an assumption.
Submittals are not a substitute for a scope change
A reviewed product sheet or shop drawing does not automatically authorize a change in price, time, or design scope. If the team identifies a product substitution, concealed condition, or owner-requested change, document the proposed difference and follow the contract’s change process. Keep the approved submittal, related correspondence, and formal authorization connected in the project record.
For broader project planning, see Brady’s guide to what to expect during a commercial construction project and pre-construction services.
A short owner checklist
- Request a project-specific submittal register and priority list.
- Identify decisions the owner must make and the information needed to make them.
- Connect review dates to procurement and occupancy milestones.
- Track revisions and resubmissions rather than relying on email threads alone.
- Confirm that proposed substitutions are evaluated against the contract documents.
- Document cost or schedule changes through the agreed change process.
Plan the decisions before the work starts
Brady Construction Group supports commercial tenant improvements, renovations, and pre-construction planning. Share your property location, plans, and target occupancy date so the team can discuss the scope and decision path.
Reference: AIA, “According to Hoyle: The Submittal Process”. Specific obligations depend on each project’s contract documents.

