Observed conditions. Useful next steps.
Define what the inspection needs to answer.
For a Los Angeles building with several tenants, prepare a location schedule before the inspection. Identify included floors, suites, common rooms and assets, along with escort or access contacts. This prevents a general building description from being mistaken for whole-property coverage and keeps each documented condition tied to the agreed review.
The best starting point is a property decision: which repairs should be reviewed, why a condition keeps returning, or what information is missing from the maintenance plan. Share that decision along with known concerns, available records and access restrictions. Brady will discuss the areas and systems to include, how observations should be located and what reporting will support your team. Inspection coverage depends on the agreed scope and accessible conditions.
Additional testing, concealed conditions and specialist evaluations require separate consideration when they are relevant.