Construction planning · Practical guide

What Is Included in Commercial Pre-Construction?

Define the scope, budget basis, responsibilities and handoff that turn an early concept into a construction plan.

Commercial pre-construction is the planning work that defines what will be built, what information is still needed, how the project will be priced and what must happen before field work begins. A useful scope combines existing-condition review, budgeting, design coordination, constructability, scheduling and procurement planning. The deliverables and responsibilities should be agreed for the individual project.

For an owner, the outcome should be practical: a documented scope, a traceable budget basis, clear decisions and a realistic path to construction. This guide explains what to request and how to recognize a useful handoff. See Brady’s commercial pre-construction services for the service overview.

What should commercial pre-construction include?

Specify the outputs, not just a list of meetings. A tenant improvement with partial drawings may need a different planning assignment from an occupied renovation or a new commercial building. Use the following items to establish the scope that fits your decision.

Match each planning activity to an output you can use
ActivityDeliverable to agreeDecision it supports
Project brief and scope definitionIntended use, work areas, priorities, exclusions and responsibility for owner, landlord and vendor packages.What are we pricing and who is providing each part?
Existing-condition and feasibility reviewAvailable information, observations, unresolved conditions and recommended investigations with assigned responsibility.What needs to be confirmed before the concept or budget can advance?
Preliminary estimatingDated budget with a stated design basis, assumptions, allowances, alternates and exclusions.Does the scope fit the available budget, and where must it be refined?
Design coordination and constructabilityQuestions and conflicts affecting scope, installation, access, sequencing or interfaces between trades.Which design decisions are needed before pricing, procurement or field work?
Milestone and procurement planningDependencies for design, decisions, approvals, purchasing, site access and construction.What could control the start or finish, and when is a decision needed?
Approval coordinationRequired approval paths, responsible applicants, supporting documents and open agency questions.Which permissions and documents are needed before the relevant work?
Construction handoffCurrent scope, pricing basis, open-item register, package responsibilities and next authorizations.What is ready to commit, and what remains conditional?

A budget should explain its basis

A number without its assumptions is difficult to use. Ask which drawing issue, site information, quantities, equipment and selections informed the estimate. Identify whether an item is priced, allowed for, excluded or awaiting information. Keep the owner’s contingency separate from contractor allowances and optional scope.

The Southern California tenant improvement cost guide explains the budget categories and questions to use when comparing proposals. For an early concept, also read budgeting before the scope is fully developed.

Constructability review should produce decisions

Useful questions are specific: Can the proposed equipment be delivered through the available access? Are ceiling systems and building services coordinated? Is a shutdown needed before work can proceed? Who supplies the final equipment dimensions and connection data?

Record each question, its effect, the responsible person and the date the answer is needed. Send design changes to the responsible design professional rather than treating a field assumption as an approved detail. Our drawing-readiness guide explains how to keep the current plan set and revisions organized.

How the planning sequence works

  1. Define the decision. Decide whether the immediate need is lease evaluation, concept feasibility, budget alignment, design development or readiness to procure. Record business priorities, operational constraints and approval contacts.
  2. Review information and identify gaps. Compare the proposed use with available plans and observed conditions. Agree which investigations, consultant inputs or agency questions should be addressed next.
  3. Develop and compare options. Coordinate the design and budget. Evaluate alternatives by installed scope, performance, availability and operating needs; document what the owner accepts or declines.
  4. Prepare the next commitment. Update the scope, budget, milestone schedule and open items. Confirm the documents and authorization required before ordering materials, releasing a package or starting construction.

These steps can repeat as information improves. An early estimate does not become more reliable simply because time has passed; it improves when assumptions are resolved and the pricing basis is updated.

Set responsibilities and scope boundaries early

Pre-construction coordination does not automatically include every professional service or investigation. The agreement should identify who is responsible for design, engineering, surveys, testing, hazardous-material evaluation, utility work and agency submissions where they are needed. Record any services or fees that are separate.

A visual site review also has limits: existing drawings may be incomplete, and concealed conditions may require an authorized investigation. Identify those limits in the findings and budget rather than silently assuming the conditions are known.

Clarify these points in the planning scope
QuestionWhat to record
Which deliverables are included?Budget issues, site visits, coordination activities, schedules, reports and the level of detail expected.
Who supplies and approves information?Owner, landlord, design team and vendor contacts, with decision and response responsibilities.
Which investigations are authorized?Purpose, access, protection, restoration, specialist involvement and how findings will be documented.
What is separate from the planning fee?Consultant services, agency fees, testing, revised scope and any separately approved purchasing.
What authorizes the next phase?Required decisions, written approvals and the terms for moving to design, procurement or construction.

Pre-construction can support different delivery methods. In design-build, the planning work supports coordinated design and construction responsibility. It can also help an owner prepare a scope for separate construction procurement. Use our design-build versus design-bid-build comparison when choosing that structure.

Treat approvals and procurement as schedule dependencies

Separate the target opening date from the steps that make it possible. A useful milestone schedule identifies required owner decisions, design completion, landlord approvals, agency review, utility coordination, long-lead purchasing and access to the work areas. Assign responsibility for each item and show what must happen first.

Agency review may require corrections and resubmittal. The City of Riverside’s plan-check guidance, for example, describes review through the required departments and continued review until the plans are approved for permit issuance. Build the actual review path into the plan instead of treating the first submittal as an approved construction start.

The California Energy Commission states that the 2025 Energy Code applies to permit applications made on or after January 1, 2026. Confirm the applicable code edition and project requirements with the design team and responsible jurisdiction. Planning should also identify which compliance documents, testing or verification may affect the agreed scope.

For purchasing, distinguish a supplier’s indicated lead time from an authorized order and confirmed delivery. Check whether a selection, submittal, deposit, approval or site condition must be resolved first. Early procurement should be an explicit decision with scope, storage, delivery and change risks understood.

What should be ready at the construction handoff?

Use this checklist at the final planning review. If an item is still open, record its owner, next action and effect on the package being authorized.

  • The current scope, drawing issue and approved selections are identified.
  • Owner, landlord, vendor and construction responsibilities are documented.
  • Pricing assumptions, allowances, exclusions and accepted alternates are understood.
  • Required approvals are obtained or explicitly tracked before the affected work.
  • Long-lead items and their release requirements are included in the schedule.
  • Occupied areas, access, protection, deliveries and shutdown procedures are coordinated.
  • Outstanding conditions and investigations have a clear resolution plan.
  • Decision contacts, reporting expectations and the written change process are agreed.
  • Inspection, testing and closeout responsibilities are identified for the applicable scope.

What to bring to the first conversation

Start with the address, intended use, approximate work area, available drawings or photos, landlord criteria and business priorities. Bring equipment information, known building concerns and operating restrictions when available. A target budget or opening date is useful context, even if it still needs to be tested.

Tell the team what you need to decide next. “Can this suite support our proposed operation?” calls for a different first assignment from “Are these drawings ready for comparable construction pricing?” Unresolved information can become the planning work list.

Common pre-construction questions

Can pre-construction start before design is complete?

Yes. Early scope, feasibility and budget work can help guide the design. Define the information available and the decisions each deliverable will support, then update the budget and schedule as the design develops.

Does pre-construction include permit approval?

It can include agreed permit planning and coordination, but the relevant authorities control approvals. Confirm who prepares and submits each package, pays the fees, answers comments and tracks approval before the affected work.

Does a preliminary budget guarantee the final construction price?

No. It reflects a stated scope and the information available when prepared. A construction commitment needs its own defined scope, assumptions and commercial terms. Track changes as drawings, selections and conditions become clearer.

Is pre-construction only useful for large projects?

No. A smaller TI with uncertain utilities, incomplete drawings or occupied operations may benefit from focused planning. Scale the assignment to the decisions and risks involved rather than requesting a large planning package by default.

Plan your Southern California project with Brady

Explore pre-construction service coverage in Irvine, Ontario, Riverside and Temecula. Additional cities appear on the main pre-construction page.

Discuss a Construction Project

Share the property and the decision you need help making. Brady can discuss the appropriate planning scope and next steps for your commercial project.