24/7 commercial facility service

Emergency Building & Facility Repairs

When a building problem interrupts operations, call Brady. We coordinate urgent commercial repairs, site access and the next steps with your property team.

Based in Southern California, serving commercial properties across California. Call for urgent requests; our team will confirm availability and attendance.

Two industrial maintenance technicians reviewing information together.
A clear plan for the property.Scope, access and authorization coordinated with your team.

Commercial propertiesOffices, retail, industrial and warehouse facilities.

24/7 emergency serviceCall for urgent and after-hours repair requests.

Work-order reportingDocumented service activity and follow-up needs.

What needs attention?

Urgent repairs for your building and its systems.

Tell us what has failed, where the problem is occurring and how it affects occupants or operations. We review the required trade, site conditions and access before confirming the service arrangements.

Plumbing & water intrusion

Leaks, fixture failures and water entering occupied areas. We review the affected locations, site conditions and the appropriate repair scope.

Commercial roof leak repair

Electrical & lighting

Electrical faults, lighting failures and interruptions affecting working areas. Tell us whether the issue is isolated or building-wide.

HVAC & building systems

Heating, cooling and building-system failures that interrupt use of the space. Share the affected areas, equipment details and access requirements.

Doors & interior damage

Damaged doors, ceiling components, drywall and finishes that affect access or daily operations. We coordinate the scope with your property team.

Some conditions require additional specialists, materials or a separately approved scope. For work that can be scheduled, see commercial building repairs or building systems maintenance.

Engineer in a safety vest using a tablet to document a site inspection.

Make the first call useful

Have the location, issue and site contact ready.

A few details help us understand the request and coordinate the next step with the right people.

  • Property and affected areaStreet address, building or suite, and the rooms or systems involved.
  • Issue and business impactWhat happened, when it started and how occupants or operations are affected. Share photos when safe to take them.
  • Site access and contactWho can meet the service team, operating hours, access instructions and site requirements.
  • Authorization for workThe person who can approve assessment and repairs, approval limits and any purchase-order requirements.

For an immediate danger to people, contact the appropriate emergency services and follow your site’s emergency procedures. An online service request is not a confirmed dispatch.

From request to follow-up

Keep the repair process clear.

  1. 01 / DISCUSS

    Review the issue.

    Explain the property conditions, affected operations and requested work. Identify the site contact and the person authorized to approve service.

  2. 02 / CONFIRM

    Arrange the visit.

    Confirm availability, the required trade, access and authorization. Attendance and scheduling are confirmed for the specific request.

  3. 03 / ADDRESS

    Agree on the repair.

    Review assessment findings and approved repair options. Additional work, materials or specialist needs are discussed as the scope becomes clear.

  4. 04 / DOCUMENT

    Review the service record.

    Receive a full work-order report through our service platform, plus an inspection form when inspections are involved. Review completed work and remaining needs.

For recurring issues, discuss preventive maintenance and facility inspections after the urgent repair scope is addressed.

Managing several locations? Our multi-site facility services help coordinate site contacts, requests, approvals and follow-up.

Before you call

Emergency repair questions.

Is emergency facility service available after hours?

Yes. Brady provides emergency facility services 24 hours a day, seven days a week. Call 909 293 9861 to discuss the issue, property location and access. Our team will confirm the service arrangements.

How soon can someone attend the property?

Attendance depends on the location, required trade, site access and available resources. Describe the urgency when you call so we can confirm availability and next steps for your property.

Does submitting the service form schedule a visit?

No. The form sends your service details for review; it is not a confirmed dispatch. Call for urgent requests. A visit requires confirmation of availability, access and authorization from our team.

What determines the cost of an emergency repair?

The assessment, required trade, after-hours arrangements, materials and agreed repair scope affect the cost. Confirm the applicable charges and approval requirements with our team before authorizing work.

What if the issue needs a larger construction project?

We can discuss the urgent repair needs and a separate scope for larger improvements. If you are planning a remodel or build-out, discuss a construction project with our team.

Counties & cities we serve

Emergency repairs across California.

Find your property location below. Open a county to see its cities, or search for a city by name.

58 counties · 483 incorporated cities and towns

San Bernardino County24 cities / towns
  • Adelanto
  • Apple Valley
  • Barstow
  • Big Bear Lake
  • Chino
  • Chino Hills
  • Colton
  • Fontana
  • Grand Terrace
  • Hesperia
  • Highland
  • Loma Linda
  • Montclair
  • Needles
  • Ontario
  • Rancho Cucamonga
  • Redlands
  • Rialto
  • San Bernardino
  • Twentynine Palms
  • Upland
  • Victorville
  • Yucaipa
  • Yucca Valley
Los Angeles County88 cities / towns
  • Agoura Hills
  • Alhambra
  • Arcadia
  • Artesia
  • Avalon
  • Azusa
  • Baldwin Park
  • Bell
  • Bell Gardens
  • Bellflower
  • Beverly Hills
  • Bradbury
  • Burbank
  • Calabasas
  • Carson
  • Cerritos
  • City of Industry
  • Claremont
  • Commerce
  • Compton
  • Covina
  • Cudahy
  • Culver City
  • Diamond Bar
  • Downey
  • Duarte
  • El Monte
  • El Segundo
  • Gardena
  • Glendale
  • Glendora
  • Hawaiian Gardens
  • Hawthorne
  • Hermosa Beach
  • Hidden Hills
  • Huntington Park
  • Inglewood
  • Irwindale
  • La Cañada Flintridge
  • La Habra Heights
  • La Mirada
  • La Puente
  • La Verne
  • Lakewood
  • Lancaster
  • Lawndale
  • Lomita
  • Long Beach
  • Los Angeles
  • Lynwood
  • Malibu
  • Manhattan Beach
  • Maywood
  • Monrovia
  • Montebello
  • Monterey Park
  • Norwalk
  • Palmdale
  • Palos Verdes Estates
  • Paramount
  • Pasadena
  • Pico Rivera
  • Pomona
  • Rancho Palos Verdes
  • Redondo Beach
  • Rolling Hills
  • Rolling Hills Estates
  • Rosemead
  • San Dimas
  • San Fernando
  • San Gabriel
  • San Marino
  • Santa Clarita
  • Santa Fe Springs
  • Santa Monica
  • Sierra Madre
  • Signal Hill
  • South El Monte
  • South Gate
  • South Pasadena
  • Temple City
  • Torrance
  • Vernon
  • Walnut
  • West Covina
  • West Hollywood
  • Westlake Village
  • Whittier
Orange County34 cities / towns
  • Aliso Viejo
  • Anaheim
  • Brea
  • Buena Park
  • Costa Mesa
  • Cypress
  • Dana Point
  • Fountain Valley
  • Fullerton
  • Garden Grove
  • Huntington Beach
  • Irvine
  • La Habra
  • La Palma
  • Laguna Beach
  • Laguna Hills
  • Laguna Niguel
  • Laguna Woods
  • Lake Forest
  • Los Alamitos
  • Mission Viejo
  • Newport Beach
  • Orange
  • Placentia
  • Rancho Santa Margarita
  • San Clemente
  • San Juan Capistrano
  • Santa Ana
  • Seal Beach
  • Stanton
  • Tustin
  • Villa Park
  • Westminster
  • Yorba Linda
Riverside County28 cities / towns
  • Banning
  • Beaumont
  • Blythe
  • Calimesa
  • Canyon Lake
  • Cathedral City
  • Coachella
  • Corona
  • Desert Hot Springs
  • Eastvale
  • Hemet
  • Indian Wells
  • Indio
  • Jurupa Valley
  • La Quinta
  • Lake Elsinore
  • Menifee
  • Moreno Valley
  • Murrieta
  • Norco
  • Palm Desert
  • Palm Springs
  • Perris
  • Rancho Mirage
  • Riverside
  • San Jacinto
  • Temecula
  • Wildomar
San Diego County18 cities / towns
  • Carlsbad
  • Chula Vista
  • Coronado
  • Del Mar
  • El Cajon
  • Encinitas
  • Escondido
  • Imperial Beach
  • La Mesa
  • Lemon Grove
  • National City
  • Oceanside
  • Poway
  • San Diego
  • San Marcos
  • Santee
  • Solana Beach
  • Vista
Ventura County10 cities / towns
  • Camarillo
  • Fillmore
  • Moorpark
  • Ojai
  • Oxnard
  • Port Hueneme
  • Santa Paula
  • Simi Valley
  • Thousand Oaks
  • Ventura (San Buenaventura)
Browse 52 more California counties
Alameda County14 cities / towns
  • Alameda
  • Albany
  • Berkeley
  • Dublin
  • Emeryville
  • Fremont
  • Hayward
  • Livermore
  • Newark
  • Oakland
  • Piedmont
  • Pleasanton
  • San Leandro
  • Union City
Alpine CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Amador County5 cities / towns
  • Amador City
  • Ione
  • Jackson
  • Plymouth
  • Sutter Creek
Butte County5 cities / towns
  • Biggs
  • Chico
  • Gridley
  • Oroville
  • Paradise
Calaveras County1 city / town
  • Angels Camp
Colusa County2 cities / towns
  • Colusa
  • Williams
Contra Costa County19 cities / towns
  • Antioch
  • Brentwood
  • Clayton
  • Concord
  • Danville
  • El Cerrito
  • Hercules
  • Lafayette
  • Martinez
  • Moraga
  • Oakley
  • Orinda
  • Pinole
  • Pittsburg
  • Pleasant Hill
  • Richmond
  • San Pablo
  • San Ramon
  • Walnut Creek
Del Norte County1 city / town
  • Crescent City
El Dorado County2 cities / towns
  • Placerville
  • South Lake Tahoe
Fresno County15 cities / towns
  • Clovis
  • Coalinga
  • Firebaugh
  • Fowler
  • Fresno
  • Huron
  • Kerman
  • Kingsburg
  • Mendota
  • Orange Cove
  • Parlier
  • Reedley
  • San Joaquin
  • Sanger
  • Selma
Glenn County2 cities / towns
  • Orland
  • Willows
Humboldt County7 cities / towns
  • Arcata
  • Blue Lake
  • Eureka
  • Ferndale
  • Fortuna
  • Rio Dell
  • Trinidad
Imperial County7 cities / towns
  • Brawley
  • Calexico
  • Calipatria
  • El Centro
  • Holtville
  • Imperial
  • Westmorland
Inyo County1 city / town
  • Bishop
Kern County11 cities / towns
  • Arvin
  • Bakersfield
  • California City
  • Delano
  • Maricopa
  • McFarland
  • Ridgecrest
  • Shafter
  • Taft
  • Tehachapi
  • Wasco
Kings County4 cities / towns
  • Avenal
  • Corcoran
  • Hanford
  • Lemoore
Lake County2 cities / towns
  • Clearlake
  • Lakeport
Lassen County1 city / town
  • Susanville
Madera County2 cities / towns
  • Chowchilla
  • Madera
Marin County11 cities / towns
  • Belvedere
  • Corte Madera
  • Fairfax
  • Larkspur
  • Mill Valley
  • Novato
  • Ross
  • San Anselmo
  • San Rafael
  • Sausalito
  • Tiburon
Mariposa CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Mendocino County4 cities / towns
  • Fort Bragg
  • Point Arena
  • Ukiah
  • Willits
Merced County6 cities / towns
  • Atwater
  • Dos Palos
  • Gustine
  • Livingston
  • Los Banos
  • Merced
Modoc County1 city / town
  • Alturas
Mono County1 city / town
  • Mammoth Lakes
Monterey County12 cities / towns
  • Carmel-by-the-Sea
  • Del Rey Oaks
  • Gonzales
  • Greenfield
  • King City
  • Marina
  • Monterey
  • Pacific Grove
  • Salinas
  • Sand City
  • Seaside
  • Soledad
Napa County5 cities / towns
  • American Canyon
  • Calistoga
  • Napa
  • St. Helena
  • Yountville
Nevada County3 cities / towns
  • Grass Valley
  • Nevada City
  • Truckee
Placer County6 cities / towns
  • Auburn
  • Colfax
  • Lincoln
  • Loomis
  • Rocklin
  • Roseville
Plumas County1 city / town
  • Portola
Sacramento County7 cities / towns
  • Citrus Heights
  • Elk Grove
  • Folsom
  • Galt
  • Isleton
  • Rancho Cordova
  • Sacramento
San Benito County2 cities / towns
  • Hollister
  • San Juan Bautista
San Francisco County1 city / town
  • San Francisco
San Joaquin County8 cities / towns
  • Escalon
  • Lathrop
  • Lodi
  • Manteca
  • Mountain House
  • Ripon
  • Stockton
  • Tracy
San Luis Obispo County7 cities / towns
  • Arroyo Grande
  • Atascadero
  • El Paso de Robles (Paso Robles)
  • Grover Beach
  • Morro Bay
  • Pismo Beach
  • San Luis Obispo
San Mateo County20 cities / towns
  • Atherton
  • Belmont
  • Brisbane
  • Burlingame
  • Colma
  • Daly City
  • East Palo Alto
  • Foster City
  • Half Moon Bay
  • Hillsborough
  • Menlo Park
  • Millbrae
  • Pacifica
  • Portola Valley
  • Redwood City
  • San Bruno
  • San Carlos
  • San Mateo
  • South San Francisco
  • Woodside
Santa Barbara County8 cities / towns
  • Buellton
  • Carpinteria
  • Goleta
  • Guadalupe
  • Lompoc
  • Santa Barbara
  • Santa Maria
  • Solvang
Santa Clara County15 cities / towns
  • Campbell
  • Cupertino
  • Gilroy
  • Los Altos
  • Los Altos Hills
  • Los Gatos
  • Milpitas
  • Monte Sereno
  • Morgan Hill
  • Mountain View
  • Palo Alto
  • San Jose
  • Santa Clara
  • Saratoga
  • Sunnyvale
Santa Cruz County4 cities / towns
  • Capitola
  • Santa Cruz
  • Scotts Valley
  • Watsonville
Shasta County3 cities / towns
  • Anderson
  • Redding
  • Shasta Lake
Sierra County1 city / town
  • Loyalton
Siskiyou County9 cities / towns
  • Dorris
  • Dunsmuir
  • Etna
  • Fort Jones
  • Montague
  • Mount Shasta
  • Tulelake
  • Weed
  • Yreka
Solano County7 cities / towns
  • Benicia
  • Dixon
  • Fairfield
  • Rio Vista
  • Suisun City
  • Vacaville
  • Vallejo
Sonoma County9 cities / towns
  • Cloverdale
  • Cotati
  • Healdsburg
  • Petaluma
  • Rohnert Park
  • Santa Rosa
  • Sebastopol
  • Sonoma
  • Windsor
Stanislaus County9 cities / towns
  • Ceres
  • Hughson
  • Modesto
  • Newman
  • Oakdale
  • Patterson
  • Riverbank
  • Turlock
  • Waterford
Sutter County2 cities / towns
  • Live Oak
  • Yuba City
Tehama County3 cities / towns
  • Corning
  • Red Bluff
  • Tehama
Trinity CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Tulare County8 cities / towns
  • Dinuba
  • Exeter
  • Farmersville
  • Lindsay
  • Porterville
  • Tulare
  • Visalia
  • Woodlake
Tuolumne County1 city / town
  • Sonora
Yolo County4 cities / towns
  • Davis
  • West Sacramento
  • Winters
  • Woodland
Yuba County2 cities / towns
  • Marysville
  • Wheatland

Based in Southern California, serving commercial properties throughout the state. Share the address and required trade so we can confirm service arrangements.

We also serve unincorporated communities. If your community is not listed, contact us with the property address and scope.

Contractor qualifications and vendor onboarding

Planning resources

Emergency Facility Repairs resources.

Practical guidance for planning maintenance, reviewing building conditions and coordinating property care.

Speak with Brady

Need urgent help at a commercial property?

Call with the property address, the issue affecting the building and an on-site contact. We will discuss the scope, access and next steps.