Brady Construction Group · Facility Services

Commercial Building Repairs in Southern California

Keep commercial spaces functional, presentable and ready for business. Brady Construction Group coordinates repairs across building interiors, doors, finishes and exterior components, with a defined scope and attention to occupied properties.

Commercial property repair

One repair list. A practical plan to complete it.

Small defects can accumulate across a commercial property: a sticking door, damaged drywall, worn flooring or a ceiling affected by a previous leak. Brady helps property managers and facility teams define the work, coordinate access and organize the trades needed for a clear repair scope.

Request a single repair or discuss a list of maintenance items at an office, retail property, warehouse or other commercial building. Tell us what is affected, where it is located and whether the space will remain occupied during the work.

For HVAC, electrical and plumbing concerns, explore building systems maintenance.

Spacious lobby with glazed entry doors, tall windows, lounge seating and polished flooring.

Repair scopes

Support for the everyday condition of your building.

Give each repair a location, observed condition and desired result. Include photographs and available material information, and note whether an underlying leak or other issue has been addressed. Scope review can then separate repair work, finish matching, additional assessment and proposed upgrades before scheduling.

Drywall, ceilings and paint

Discuss damaged wall areas, ceiling components, patching and finish restoration. Where damage follows a leak or other recurring issue, the cause should be evaluated before cosmetic repairs are planned.

Doors, hardware and interiors

Describe damaged doors, hardware, trim, flooring and other interior components. Include the location, condition and access constraints so the repair scope and material requirements can be assessed.

Exterior and common areas

Request review of building exterior repairs, common-area wear and property maintenance items. Photos and a written issue list help identify the work, appropriate trade and any additional evaluation needed.

Commercial interior with renovation and repair work in progress

Occupied commercial properties

Plan the work around the people using the space.

Identify rooms or areas that can be released for work together and those that must remain in use. Share tenant hours, customer routes, delivery periods and the approval contact. Review the proposed repair sequence and material requirements against those restrictions before notifying occupants of an agreed work window.

  • Define the items: identify each location, observed condition and desired result.
  • Coordinate the site: confirm access, work areas and stakeholder contacts.
  • Approve the scope: clarify materials, exclusions and authorization before work begins.
  • Review the work: receive a full work-order report through Brady’s custom service platform, plus an inspection form when inspections are involved. Monitor repair activities by location alongside assets and maintenance.

For a prioritized condition review, discuss commercial facility inspections.

California service coverage

Commercial service across California.

Discuss service for office buildings, retail properties, industrial and warehouse facilities, and other commercial buildings across California. Share the address, property type and required trade so we can confirm coverage and scheduling for your location.

Managing several properties? Explore multi-site facility services for coordinated requests, site access and approvals.

Common questions

Choosing the right repair service.

Can you handle several repair trades in one request?

Yes. Share the complete issue list so we can review the trade requirements, site access and work sequence. Availability and the specific repair scope are confirmed for each property.

What if the issue needs urgent attention?

Call 909 293 9861 for 24/7 emergency facility service. Visit emergency facility repairs for the information to have ready when you call.

When is a repair a construction project?

Changes to layouts, a new tenant build-out or a larger renovation may be better suited to our construction division. Explore commercial tenant improvements when the goal extends beyond maintaining or repairing existing spaces.

Can you help reduce recurring repair issues?

A preventive maintenance program can organize routine attention and follow-up for known property needs. Recurring problems may also require assessment of an underlying condition before another repair is approved.

Planning resources

Commercial Building Repairs resources.

Practical guidance for planning maintenance, reviewing building conditions and coordinating property care.

Areas we serve

Commercial building repairs across California.

Based in Southern California, Brady supports commercial properties throughout the state. Share your property locations, requested trades and service needs so we can confirm scheduling and the next step.

Contractor qualifications and vendor onboarding

Browse all California counties58 counties · 483 incorporated cities and towns
Alameda County14 cities / towns
  • Alameda
  • Albany
  • Berkeley
  • Dublin
  • Emeryville
  • Fremont
  • Hayward
  • Livermore
  • Newark
  • Oakland
  • Piedmont
  • Pleasanton
  • San Leandro
  • Union City
Alpine CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Amador County5 cities / towns
  • Amador City
  • Ione
  • Jackson
  • Plymouth
  • Sutter Creek
Butte County5 cities / towns
  • Biggs
  • Chico
  • Gridley
  • Oroville
  • Paradise
Calaveras County1 city / town
  • Angels Camp
Colusa County2 cities / towns
  • Colusa
  • Williams
Contra Costa County19 cities / towns
  • Antioch
  • Brentwood
  • Clayton
  • Concord
  • Danville
  • El Cerrito
  • Hercules
  • Lafayette
  • Martinez
  • Moraga
  • Oakley
  • Orinda
  • Pinole
  • Pittsburg
  • Pleasant Hill
  • Richmond
  • San Pablo
  • San Ramon
  • Walnut Creek
Del Norte County1 city / town
  • Crescent City
El Dorado County2 cities / towns
  • Placerville
  • South Lake Tahoe
Fresno County15 cities / towns
  • Clovis
  • Coalinga
  • Firebaugh
  • Fowler
  • Fresno
  • Huron
  • Kerman
  • Kingsburg
  • Mendota
  • Orange Cove
  • Parlier
  • Reedley
  • San Joaquin
  • Sanger
  • Selma
Glenn County2 cities / towns
  • Orland
  • Willows
Humboldt County7 cities / towns
  • Arcata
  • Blue Lake
  • Eureka
  • Ferndale
  • Fortuna
  • Rio Dell
  • Trinidad
Imperial County7 cities / towns
  • Brawley
  • Calexico
  • Calipatria
  • El Centro
  • Holtville
  • Imperial
  • Westmorland
Inyo County1 city / town
  • Bishop
Kern County11 cities / towns
  • Arvin
  • Bakersfield
  • California City
  • Delano
  • Maricopa
  • McFarland
  • Ridgecrest
  • Shafter
  • Taft
  • Tehachapi
  • Wasco
Kings County4 cities / towns
  • Avenal
  • Corcoran
  • Hanford
  • Lemoore
Lake County2 cities / towns
  • Clearlake
  • Lakeport
Lassen County1 city / town
  • Susanville
Los Angeles County88 cities / towns
  • Agoura Hills
  • Alhambra
  • Arcadia
  • Artesia
  • Avalon
  • Azusa
  • Baldwin Park
  • Bell
  • Bell Gardens
  • Bellflower
  • Beverly Hills
  • Bradbury
  • Burbank
  • Calabasas
  • Carson
  • Cerritos
  • City of Industry
  • Claremont
  • Commerce
  • Compton
  • Covina
  • Cudahy
  • Culver City
  • Diamond Bar
  • Downey
  • Duarte
  • El Monte
  • El Segundo
  • Gardena
  • Glendale
  • Glendora
  • Hawaiian Gardens
  • Hawthorne
  • Hermosa Beach
  • Hidden Hills
  • Huntington Park
  • Inglewood
  • Irwindale
  • La Cañada Flintridge
  • La Habra Heights
  • La Mirada
  • La Puente
  • La Verne
  • Lakewood
  • Lancaster
  • Lawndale
  • Lomita
  • Long Beach
  • Los Angeles
  • Lynwood
  • Malibu
  • Manhattan Beach
  • Maywood
  • Monrovia
  • Montebello
  • Monterey Park
  • Norwalk
  • Palmdale
  • Palos Verdes Estates
  • Paramount
  • Pasadena
  • Pico Rivera
  • Pomona
  • Rancho Palos Verdes
  • Redondo Beach
  • Rolling Hills
  • Rolling Hills Estates
  • Rosemead
  • San Dimas
  • San Fernando
  • San Gabriel
  • San Marino
  • Santa Clarita
  • Santa Fe Springs
  • Santa Monica
  • Sierra Madre
  • Signal Hill
  • South El Monte
  • South Gate
  • South Pasadena
  • Temple City
  • Torrance
  • Vernon
  • Walnut
  • West Covina
  • West Hollywood
  • Westlake Village
  • Whittier
Madera County2 cities / towns
  • Chowchilla
  • Madera
Marin County11 cities / towns
  • Belvedere
  • Corte Madera
  • Fairfax
  • Larkspur
  • Mill Valley
  • Novato
  • Ross
  • San Anselmo
  • San Rafael
  • Sausalito
  • Tiburon
Mariposa CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Mendocino County4 cities / towns
  • Fort Bragg
  • Point Arena
  • Ukiah
  • Willits
Merced County6 cities / towns
  • Atwater
  • Dos Palos
  • Gustine
  • Livingston
  • Los Banos
  • Merced
Modoc County1 city / town
  • Alturas
Mono County1 city / town
  • Mammoth Lakes
Monterey County12 cities / towns
  • Carmel-by-the-Sea
  • Del Rey Oaks
  • Gonzales
  • Greenfield
  • King City
  • Marina
  • Monterey
  • Pacific Grove
  • Salinas
  • Sand City
  • Seaside
  • Soledad
Napa County5 cities / towns
  • American Canyon
  • Calistoga
  • Napa
  • St. Helena
  • Yountville
Nevada County3 cities / towns
  • Grass Valley
  • Nevada City
  • Truckee
Orange County34 cities / towns
  • Aliso Viejo
  • Anaheim
  • Brea
  • Buena Park
  • Costa Mesa
  • Cypress
  • Dana Point
  • Fountain Valley
  • Fullerton
  • Garden Grove
  • Huntington Beach
  • Irvine
  • La Habra
  • La Palma
  • Laguna Beach
  • Laguna Hills
  • Laguna Niguel
  • Laguna Woods
  • Lake Forest
  • Los Alamitos
  • Mission Viejo
  • Newport Beach
  • Orange
  • Placentia
  • Rancho Santa Margarita
  • San Clemente
  • San Juan Capistrano
  • Santa Ana
  • Seal Beach
  • Stanton
  • Tustin
  • Villa Park
  • Westminster
  • Yorba Linda
Placer County6 cities / towns
  • Auburn
  • Colfax
  • Lincoln
  • Loomis
  • Rocklin
  • Roseville
Plumas County1 city / town
  • Portola
Riverside County28 cities / towns
  • Banning
  • Beaumont
  • Blythe
  • Calimesa
  • Canyon Lake
  • Cathedral City
  • Coachella
  • Corona
  • Desert Hot Springs
  • Eastvale
  • Hemet
  • Indian Wells
  • Indio
  • Jurupa Valley
  • La Quinta
  • Lake Elsinore
  • Menifee
  • Moreno Valley
  • Murrieta
  • Norco
  • Palm Desert
  • Palm Springs
  • Perris
  • Rancho Mirage
  • Riverside
  • San Jacinto
  • Temecula
  • Wildomar
Sacramento County7 cities / towns
  • Citrus Heights
  • Elk Grove
  • Folsom
  • Galt
  • Isleton
  • Rancho Cordova
  • Sacramento
San Benito County2 cities / towns
  • Hollister
  • San Juan Bautista
San Bernardino County24 cities / towns
  • Adelanto
  • Apple Valley
  • Barstow
  • Big Bear Lake
  • Chino
  • Chino Hills
  • Colton
  • Fontana
  • Grand Terrace
  • Hesperia
  • Highland
  • Loma Linda
  • Montclair
  • Needles
  • Ontario
  • Rancho Cucamonga
  • Redlands
  • Rialto
  • San Bernardino
  • Twentynine Palms
  • Upland
  • Victorville
  • Yucaipa
  • Yucca Valley
San Diego County18 cities / towns
  • Carlsbad
  • Chula Vista
  • Coronado
  • Del Mar
  • El Cajon
  • Encinitas
  • Escondido
  • Imperial Beach
  • La Mesa
  • Lemon Grove
  • National City
  • Oceanside
  • Poway
  • San Diego
  • San Marcos
  • Santee
  • Solana Beach
  • Vista
San Francisco County1 city / town
  • San Francisco
San Joaquin County8 cities / towns
  • Escalon
  • Lathrop
  • Lodi
  • Manteca
  • Mountain House
  • Ripon
  • Stockton
  • Tracy
San Luis Obispo County7 cities / towns
  • Arroyo Grande
  • Atascadero
  • El Paso de Robles (Paso Robles)
  • Grover Beach
  • Morro Bay
  • Pismo Beach
  • San Luis Obispo
San Mateo County20 cities / towns
  • Atherton
  • Belmont
  • Brisbane
  • Burlingame
  • Colma
  • Daly City
  • East Palo Alto
  • Foster City
  • Half Moon Bay
  • Hillsborough
  • Menlo Park
  • Millbrae
  • Pacifica
  • Portola Valley
  • Redwood City
  • San Bruno
  • San Carlos
  • San Mateo
  • South San Francisco
  • Woodside
Santa Barbara County8 cities / towns
  • Buellton
  • Carpinteria
  • Goleta
  • Guadalupe
  • Lompoc
  • Santa Barbara
  • Santa Maria
  • Solvang
Santa Clara County15 cities / towns
  • Campbell
  • Cupertino
  • Gilroy
  • Los Altos
  • Los Altos Hills
  • Los Gatos
  • Milpitas
  • Monte Sereno
  • Morgan Hill
  • Mountain View
  • Palo Alto
  • San Jose
  • Santa Clara
  • Saratoga
  • Sunnyvale
Santa Cruz County4 cities / towns
  • Capitola
  • Santa Cruz
  • Scotts Valley
  • Watsonville
Shasta County3 cities / towns
  • Anderson
  • Redding
  • Shasta Lake
Sierra County1 city / town
  • Loyalton
Siskiyou County9 cities / towns
  • Dorris
  • Dunsmuir
  • Etna
  • Fort Jones
  • Montague
  • Mount Shasta
  • Tulelake
  • Weed
  • Yreka
Solano County7 cities / towns
  • Benicia
  • Dixon
  • Fairfield
  • Rio Vista
  • Suisun City
  • Vacaville
  • Vallejo
Sonoma County9 cities / towns
  • Cloverdale
  • Cotati
  • Healdsburg
  • Petaluma
  • Rohnert Park
  • Santa Rosa
  • Sebastopol
  • Sonoma
  • Windsor
Stanislaus County9 cities / towns
  • Ceres
  • Hughson
  • Modesto
  • Newman
  • Oakdale
  • Patterson
  • Riverbank
  • Turlock
  • Waterford
Sutter County2 cities / towns
  • Live Oak
  • Yuba City
Tehama County3 cities / towns
  • Corning
  • Red Bluff
  • Tehama
Trinity CountyUnincorporated areas

This county has no incorporated cities or towns. Contact Brady about a property in its unincorporated communities.

Tulare County8 cities / towns
  • Dinuba
  • Exeter
  • Farmersville
  • Lindsay
  • Porterville
  • Tulare
  • Visalia
  • Woodlake
Tuolumne County1 city / town
  • Sonora
Ventura County10 cities / towns
  • Camarillo
  • Fillmore
  • Moorpark
  • Ojai
  • Oxnard
  • Port Hueneme
  • Santa Paula
  • Simi Valley
  • Thousand Oaks
  • Ventura (San Buenaventura)
Yolo County4 cities / towns
  • Davis
  • West Sacramento
  • Winters
  • Woodland
Yuba County2 cities / towns
  • Marysville
  • Wheatland

Our coverage also includes unincorporated communities. If your community is not listed as a city or town, send us the property address and scope of work.

Brady Facility Services

Tell us what your commercial property needs.

Share the property address, affected area or system, and preferred timing. Brady will review the request and confirm scope, coverage and the next step.