Change Orders in Construction: What Commercial Owners Should Review
A change order can solve a real field problem or accommodate a better decision. The key is understanding the scope, cost and schedule effect before the work moves forward.
Change orders in construction document agreed changes to the original contract. For a commercial renovation or tenant improvement, the owner’s best safeguard is a consistent review: identify what changed, why it changed, what it costs, and whether it affects the completion date or operations.
What is a construction change order?
A change order is a written modification to the construction agreement, typically describing a change in work and any adjustment to the contract sum and time. The actual approval route depends on the signed contract and project delivery method. The AIA description of its G701 change order identifies the owner, contractor and architect as participants in agreeing to the change under that form.
A request for information, field observation or verbal conversation can reveal a potential change, but it should not be treated as an approved change order by itself. Check the agreement for notice requirements, who may direct work and how changes are priced and authorized.
Why do change orders arise?
A revised layout, new finish, added room feature or equipment choice changes the planned work.
Demolition reveals an unforeseen condition that calls for a documented response and possible redesign.
Clarifications, revised drawings or system coordination can alter quantities, methods or sequencing.
Some changes are optional; others may be necessary to deliver the intended result. A clear explanation of the trigger helps the owner decide whether to proceed, select an alternative, or defer the work.
What should an owner review before approval?
- Scope and reason. Ask for the specific added, deleted or revised work, the location and the document or field condition that triggered it. Confirm what is excluded.
- Price basis. Review labor, material, equipment, subcontractor and other charges at a level appropriate to the contract. Compare the proposal with any agreed rates, allowances or markup rules in the executed agreement.
- Schedule effect. Ask whether the change affects procurement, inspections, trade sequence, access or the critical path. “No added days” and “no schedule analysis yet” are different answers.
- Operational effect. For an occupied property, identify shutdowns, noise, after-hours access, protection and tenant communication needs.
- Alternatives and credits. Consider a simpler solution or a deductive credit if original work is removed. Confirm whether the change replaces other scope or adds to it.
- Approval and record. Use the contract’s designated approver and written process. Keep the approved change with the current drawings, budget and schedule so the team works from one set of decisions.
ConsensusDocs’ project guidelines recommend establishing change procedures early, identifying who has approval authority, and making scope clear enough for realistic cost and time estimates. These are useful process principles; your contract controls the project-specific requirements.
Example: a tenant improvement behind an existing wall
Suppose demolition exposes a condition that conflicts with the planned wall assembly. The project team should document the location, confirm the existing condition, and identify feasible solutions. A useful change proposal would describe the selected correction, its cost, whether a credit applies to displaced work, and the effect on inspection or trade sequencing. The owner can then make one informed decision and preserve the record for closeout.
The example is illustrative, not a Brady project claim. It also shows why a contingency in the commercial remodel budget helps an owner respond to legitimate surprises without losing visibility into each change.
A simple process that keeps decisions moving
Log the issue when it appears. Decide whether it changes the contract. Request a proposal with scope, cost and time effects. Route it to the authorized decision-maker. Then update the budget, schedule and project documents.
Do not let a growing list of unresolved requests become the project’s unofficial scope. Review open items at regular project meetings and flag decisions tied to long-lead materials or upcoming work. If work must proceed before final price agreement, follow the contract’s written direction procedure and document the basis for the later adjustment. The ConsensusDocs interim directive description illustrates that a separate mechanism may exist for this situation; it is not interchangeable with every contract’s change-order form.
Near completion, reconcile approved changes against the final scope and punch list. That gives owners a clearer record of what was authorized, installed and left to finish.
Start with clear scope and decision paths.
Brady Construction Group works on commercial tenant improvements, renovations and design-build projects in Southern California. Share your goals, space and schedule so we can discuss a practical approach.